Science

#Halted rocket test could stall NASA moon shot, redo possible

#Halted rocket test could stall NASA moon shot, redo possible

Halted rocket test could stall NASA moon shot, redo possible
In this Saturday, Jan. 16, 2021 photo made available by NASA, the core stage for the first flight of NASA’s Space Launch System rocket undergoes a hot fire test at NASA’s Stennis Space Center near Bay St. Louis, Miss. All four core-stage engines fired for barely a minute, rather than the intended eight minutes. On Tuesday, Jan. 19, 2021, NASA blamed the automatic shutdown on the strict test limits. (Robert Markowitz/NASA via AP)

NASA is considering a second firing of its moon rocket engines after a critical test came up short over the weekend, a move that could bump the first flight in the Artemis lunar-landing program into next year.

The space agency had aimed to launch its new Space Launch System, or SLS, rocket and an empty Orion capsule by the end of this year, with the capsule flying to the moon and back as a prelude to crew missions. But that date could be in jeopardy following Saturday’s aborted test.

All four engines fired for barely a minute, rather than the intended eight minutes, on the test stand at NASA’s Stennis Space Center in Mississippi. The countdown rehearsal for the 212-foot (65-meter) core stage—made by Boeing—included the liquid hydrogen and oxygen tanks, as well as the all necessary computers and electronics.

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage so it can be used on the first Artemis flight. The hydraulic system for one engine exceeded safety parameters, officials said, and flight computers shut everything down 67 seconds into the ignition.

Two other engine-related issues also occurred.

NASA said it can adjust the test limits if a second test is deemed necessary, to prevent another premature shutdown. Engineers will continue to analyze the data before deciding on the next step.

The Artemis program is working to put astronauts back on the moon by 2024, a deadline set by the Trump administration. It’s uncertain how the incoming White House will approach that timeline.


NASA test of mega Moon rocket engines cut short


© 2021 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed without permission.

Citation:
Halted rocket test could stall NASA moon shot, redo possible (2021, January 19)
retrieved 19 January 2021
from https://phys.org/news/2021-01-halted-rocket-stall-nasa-moon.html

This document is subject to copyright. Apart from any fair dealing for the purpose of private study or research, no
part may be reproduced without the written permission. The content is provided for information purposes only.

If you liked the article, do not forget to share it with your friends. Follow us on Google News too, click on the star and choose us from your favorites.

For forums sites go to Forum.BuradaBiliyorum.Com

If you want to read more Like this articles, you can visit our Science category.

Source

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Close

Please allow ads on our site

Please consider supporting us by disabling your ad blocker!